ContID 262012 EST NO 0003 |
Date:06/05/2026 |
COMMONWEALTH OF KENTUCKY
TRANSPORTATION CABINET
| Contract ID | 262012 | Estimate Number | 0003 | Estimate Type | DRAFT_PROGRESS | ||
| District Office | PIKEVILLE (12360) Wright, Doug | ||||||
| Contractor | PAVEMENT MARKING SPECIALIST LLC | MARS ADDR SN 99 | |||||
| 500 LENA DR | |||||||
| AURORA , OH , 44202 | |||||||
| Pay Period | 05/16/2026 TO 05/29/2026 | ||||||
| Date Approved | 06/02/2026 | ||||||
| Primary Proj Number | MP12100002612 | ||||||
| Project No. | FE01 121 DW26 0120000 | ||||||
| Primary County | VARIOUS | ||||||
| Name of Road | VARIOUS ROUTES IN DISTRICT 12 | ||||||
| Description | VARIOUS ROUTES IN DISTRICT 12 | ||||||
| Date Let | 02/19/2026 | Formal Acceptance | |||||
| Date Awarded | 03/04/2026 | Date Work Began | 04/27/2026 | ||||
| Date Contract Executed | 03/18/2026 | Open To Traffic | |||||
| Date NTP Issued | 03/18/2026 | Actual Completion Date | |||||
| Current Contract Amount | $1,500,000.00 |
Total to Date |
Prev to Date |
This Estimate |
||
| Original Amount | $1,500,000.00 |
Total Earnings | $242,937.16 |
$142,355.46 |
$100,581.70 |
|
| Percent Complete | 16.20 |
Stockpiled Materials | $0.00 |
$0.00 |
$0.00 |
|
| Funds Available | $1,257,062.84 |
Gross Earnings | $242,937.16 |
$142,355.46 |
$0.00 |
|
| Total Change Orders | $0.00 |
Other Adjustments | $0.00 |
$0.00 |
$0.00 |
|
| TOTAL | $242,937.16 |
$142,355.46 |
100,581.70 |
|||
| Contract Id | 262012 | Change Order Summary |
County | VARIOUS | ||||||
| Estimate Nbr | 0003 | Project Number | FE01 121 DW26 0120000 | |||||||
| Contractor | PAVEMENT MARKING SPECIALIST LLC | Period | 05/16/2026 TO 05/29/2026 | |||||||
| CHANGE ORDERS HISTORY | ||||||||||
| CHANGE ORDER NBR | DESCRIPTION | STATUS | APPROVAL DATE | TOTAL CO AMOUNT | CONTRACT TIME ADJUSTED | |||||
CONTRACT ADJUSTMENTS HISTORY
| Contract Adjustments |
|
|
| Adjustment Description | Est No |
Adjustment Amount |
| Line Item Adjustments History | |||||||||
| PROJECT | ITEM NBR | DESCRPITION | TYPE | EST NO | ADJ QUANTITY |
UNIT PRICE |
ADJUSTED AMOUNT |
||
| Contract Id | 262012 | COMMONWEALTH OF KENTUCKY |
County | VARIOUS | ||||||
| Contract Type | TRWB WATERBOURNE PAINT STRIPING | TRANSPORTATION CABINET |
Primary Project Number | MP12100002612 | ||||||
| Estimate Nbr | 0003 | Period | 05/16/2026 TO 05/29/2026 | |||||||
| Contractor | PAVEMENT MARKING SPECIALIST LLC | |||||||||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | ||||||||
| LINE ITEM NUMBER | ITEM DESCRIPTION | ITEM NO. | UNIT | PLAN QTY | CURRENT QUANTITY | QUANTITY PAID THIS EST | QUANTITY PAID PREV. EST | QUANTITY PAID TO DATE | UNIT PRICE | AMOUNT PAID THIS EST | AMOUNT PAID TO DATE | |
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0000 OVERALL CONTRACT ITEMS | |||||||
| 0005 | QUALITY CONTROL | 02572 | LS | 1.00 | 1.000 | 0.000 | 0.000 | 15,000.00 | 0.00 | |||
| 0010 | MAINTAIN & CONTROL TRAFFIC | 02650 | LS | 1.00 | 1.000 | 0.000 | 0.000 | 14,000.00 | 0.00 | |||
| 0015 | LAW ENFORCEMENT OFFICER | 20411ED | HOUR | 24.00 | 24.000 | 0.000 | 0.000 | 80.00 | 0.00 | |||
| 0020 | WATER BLASTING EXISTING STRIPE | 22664EN | LF | 400.00 | 400.000 | 0.000 | 0.000 | 5.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0036 FLOYD COUNTY RURAL SECONDARY ROUTES | |||||||
| 0025 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES FLOYD 50% INITIAL | 06520 | MILE | 74.69 | 74.698 | 73.740 | 73.740 | 215.00 | 15,854.10 | |||
| 0027 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES FLOYD 50% FINAL | 06520 | MILE | 74.69 | 74.698 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0030 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES FLOYD 50% INITIAL | 06521 | MILE | 86.43 | 86.430 | 24.368 | 58.617 | 82.985 | 220.50 | 5,373.14 | 18,298.19 | |
| 0032 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES FLOYD 50% FINAL | 06521 | MILE | 86.43 | 86.430 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0058 JOHNSON COUNTY RURAL SECONDARY ROUTES | |||||||
| 0035 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES JOHNSON 50% INITIAL | 06520 | MILE | 61.04 | 61.042 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0037 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES JOHNSON 50% FINAL | 06520 | MILE | 61.04 | 61.042 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0040 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES JOHNSON 50% INITIAL | 06521 | MILE | 70.44 | 70.448 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0042 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES JOHNSON 50% FINAL | 06521 | MILE | 70.44 | 70.448 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0045 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES JOHNSON 50% INITIAL | 06522 | MILE | 1.24 | 1.248 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0047 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES JOHNSON 50% FINAL | 06522 | MILE | 1.24 | 1.248 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0050 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES JOHNSON 50% INITIAL | 06523 | MILE | 1.24 | 1.248 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| 0052 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES JOHNSON 50% FINAL | 06523 | MILE | 1.24 | 1.248 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0060 KNOTT COUNTY RURAL SECONDARY ROUTES | |||||||
| 0055 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES KNOTT 50% INITIAL | 06520 | MILE | 45.46 | 45.464 | 10.912 | 31.942 | 42.854 | 215.00 | 2,346.08 | 9,213.61 | |
| 0057 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES KNOTT 50% FINAL | 06520 | MILE | 45.46 | 45.464 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0060 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES KNOTT 50% INITIAL | 06521 | MILE | 58.63 | 58.632 | 57.197 | 57.197 | 220.50 | 12,611.93 | |||
| 0062 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES KNOTT 50% FINAL | 06521 | MILE | 58.63 | 58.632 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0065 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES KNOTT 50% INITIAL | 06522 | MILE | 11.60 | 11.609 | 8.658 | 0.000 | 8.658 | 294.00 | 2,545.45 | 2,545.45 | |
| 0067 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES KNOTT 50% FINAL | 06522 | MILE | 11.60 | 11.609 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0070 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES KNOTT 50% INITIAL | 06523 | MILE | 14.44 | 14.444 | 10.260 | 10.260 | 302.00 | 3,098.52 | |||
| 0072 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES KNOTT 50% FINAL | 06523 | MILE | 14.44 | 14.444 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0064 LAWRENCE COUNTY RURAL SECONDARY ROUTES | |||||||
| 0075 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES LAWRENCE 50% INITIAL | 06520 | MILE | 48.43 | 48.438 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0077 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES LAWRENCE 50% FINAL | 06520 | MILE | 48.43 | 48.438 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0080 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES LAWRENCE 50% INITIAL | 06521 | MILE | 82.29 | 82.298 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0082 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES LAWRENCE 50% FINAL | 06521 | MILE | 82.29 | 82.298 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0067 LETCHER COUNTY RURAL SECONDARY ROUTES | |||||||
| 0085 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES LETCHER 50% INITIAL | 06520 | MILE | 50.25 | 50.250 | 37.895 | 0.000 | 37.895 | 215.00 | 8,147.42 | 8,147.42 | |
| 0087 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES LETCHER 50% FINAL | 06520 | MILE | 50.25 | 50.250 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0090 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES LETCHER 50% INITIAL | 06521 | MILE | 79.92 | 79.920 | 21.004 | 3.062 | 24.066 | 220.50 | 4,631.38 | 5,306.55 | |
| 0092 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES LETCHER 50% FINAL | 06521 | MILE | 79.92 | 79.920 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0095 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES LETCHER 50% INITIAL | 06522 | MILE | 6.86 | 6.866 | 6.752 | 0.000 | 6.752 | 294.00 | 1,985.08 | 1,985.08 | |
| 0097 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES LETCHER 50% FINAL | 06522 | MILE | 6.86 | 6.866 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0100 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES LETCHER 50% INITIAL | 06523 | MILE | 6.86 | 6.866 | 6.732 | 0.000 | 6.732 | 302.00 | 2,033.06 | 2,033.06 | |
| 0102 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES LETCHER 50% FINAL | 06523 | MILE | 6.86 | 6.866 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0080 MARTIN COUNTY RURAL SECONDARY ROUTES | |||||||
| 0105 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES MARTIN 50% INITIAL | 06520 | MILE | 36.01 | 36.014 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0107 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES MARTIN 50% FINAL | 06520 | MILE | 36.01 | 36.014 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0110 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES MARTIN 50% INITIAL | 06521 | MILE | 41.80 | 41.802 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0112 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES MARTIN 50% FINAL | 06521 | MILE | 41.80 | 41.802 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0115 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES MARTIN 50% INITIAL | 06522 | MILE | 4.89 | 4.894 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0117 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES MARTIN 50% FINAL | 06522 | MILE | 4.89 | 4.894 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0120 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES MARTIN 50% INITIAL | 06523 | MILE | 4.89 | 4.894 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| 0122 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES MARTIN 50% FINAL | 06523 | MILE | 4.89 | 4.894 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0098 PIKE COUNTY RURAL SECONDARY ROUTES | |||||||
| 0125 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES PIKE 50% INITIAL | 06520 | MILE | 128.65 | 128.650 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0127 | PAVE STRIPING-WB PAINT-4 IN W RS ROUTES PIKE 50% FINAL | 06520 | MILE | 128.65 | 128.650 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0130 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES PIKE 50% INITIAL | 06521 | MILE | 86.58 | 86.586 | 23.997 | 0.000 | 23.997 | 220.50 | 5,291.33 | 5,291.33 | |
| 0132 | PAVE STRIPING-WB PAINT-4 IN Y RS ROUTES PIKE 50% FINAL | 06521 | MILE | 86.58 | 86.586 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0135 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES PIKE 50% INITIAL | 06522 | MILE | 17.22 | 17.226 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0137 | PAVE STRIPING-WB PAINT-6 IN W RS ROUTES PIKE 50% FINAL | 06522 | MILE | 17.22 | 17.226 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0140 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES PIKE 50% INITIAL | 06523 | MILE | 19.49 | 19.490 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| 0142 | PAVE STRIPING-WB PAINT-6 IN Y RS ROUTES PIKE 50% FINAL | 06523 | MILE | 19.49 | 19.490 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0121 STATE PRIMARY, STATE SECONDARY, & SUPPLEMENTAL SYSTEMS | |||||||
| 0145 | PAVE STRIPING-WB PAINT-4 IN W STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% INITIAL | 06520 | MILE | 397.24 | 397.240 | 150.489 | 25.028 | 175.517 | 215.00 | 32,355.13 | 37,736.15 | |
| 0147 | PAVE STRIPING-WB PAINT-4 IN W STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% FINAL | 06520 | MILE | 397.24 | 397.240 | 0.000 | 0.000 | 215.00 | 0.00 | |||
| 0150 | PAVE STRIPING-WB PAINT-4 IN Y STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% INITIAL | 06521 | MILE | 450.26 | 450.260 | -0.986 | 82.630 | 81.644 | 220.50 | -217.41 | 18,002.50 | |
| 0152 | PAVE STRIPING-WB PAINT-4 IN Y STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% FINAL | 06521 | MILE | 450.26 | 450.260 | 0.000 | 0.000 | 220.50 | 0.00 | |||
| 0155 | PAVE STRIPING-WB PAINT-6 IN W STATE PRIMARY ROUTES VARIOUS 50% INITIAL | 06522 | MILE | 187.64 | 187.640 | 39.770 | 19.602 | 59.372 | 294.00 | 11,692.38 | 17,455.36 | |
| 0157 | PAVE STRIPING-WB PAINT-6 IN W STATE PRIMARY ROUTES VARIOUS 50% FINAL | 06522 | MILE | 187.64 | 187.640 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0160 | PAVE STRIPING-WB PAINT-6 IN W STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% INITIAL | 06522 | MILE | 353.71 | 353.710 | 41.595 | 85.215 | 126.810 | 294.00 | 12,228.93 | 37,282.14 | |
| 0162 | PAVE STRIPING-WB PAINT-6 IN W STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% FINAL | 06522 | MILE | 353.71 | 353.710 | 0.000 | 0.000 | 294.00 | 0.00 | |||
| 0165 | PAVE STRIPING-WB PAINT-6 IN Y STATE PRIMARY ROUTES VARIOUS 50% INITIAL | 06523 | MILE | 146.11 | 146.112 | 30.956 | 16.936 | 47.892 | 302.00 | 9,348.71 | 14,463.38 | |
| 0167 | PAVE STRIPING-WB PAINT-6 IN Y STATE PRIMARY ROUTES VARIOUS 50% FINAL | 06523 | MILE | 146.11 | 146.112 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| 0170 | PAVE STRIPING-WB PAINT-6 IN Y STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% INITIAL | 06523 | MILE | 331.75 | 331.750 | 9.341 | 101.958 | 111.299 | 302.00 | 2,820.98 | 33,612.29 | |
| 0172 | PAVE STRIPING-WB PAINT-6 IN Y STATE SECONDARY&SUPPLEMENTAL(REV 2-9-26) VARIOUS 50% FINAL | 06523 | MILE | 331.75 | 331.750 | 0.000 | 0.000 | 302.00 | 0.00 | |||
| Project | MP12100002612 | Fed/State Project Number | FE01 121 DW26 0120000 | Category | 0125 DEMOBILIZATION | |||||||
| 0175 | DEMOBILIZATION | 02569 | LS | 1.00 | 1.000 | 0.000 | 0.000 | 23,446.80 | 0.00 | |||
| SUBTOT | $100,581.69 |
$242,937.128 |
||||||||||
| LNNBR | STOCKPILE ADJUSTMENTS | UNIT |
ADJ. QUANTITY |
EST NBR |
UNIT PRICE | ADJUSTED AMOUNT |
||||||
| SUBTOT | 0.00 |
$0.000 |
||||||||||